California Park Road Opening Dates
In California the opening date is a plowing question, not a calendar question. Below: the normal season for every road, entrance, campground and visitor centre the parks here publish one for, drawn on a single calendar; the years of actual opening dates where a park keeps that record; and the link to the page where the park posts today. Every date carries the park's own last-updated stamp, read on 3 September 2026.
Tioga Road, Highway 120 across the park over Tioga Pass has opened as early as 8 April and as late as 22 July in 68 published seasonsCalifornia, in one paragraph
Tioga Road, Highway 120 across the park over Tioga Pass has opened anywhere from 8 April to 22 July.
Typically late May or June until sometime in November, with plowing starting around 15 April. California has the two best documented plow operations in the country. Yosemite publishes Tioga Road opening dates back to the 1950s with the 1 April snowpack beside each one, and Lassen publishes its highway back to 1980 with the snow depth at Lake Helen, so this is the one state where you can actually see how much a heavy winter costs you in weeks.
That season is Yosemite National Park's own description, from a page the park stamps last updated May 13, 2026.
Everything seasonal in California, on one calendar
- Opens on plowing progress
- Park published dates
- Fixed by rule each year
- Open year round, storm closures
Every road, entrance, campground and visitor centre in California with a published season, ordered by when it normally opens. Bars are the park's own description, not a status and not a forecast. The colour says what governs the date.
Yosemite National Park, Tioga and Glacier Point Roads Plowing and Road Opening Update“Each spring, plowing crews set out to clear 45.5 miles along the Tioga Road. Crews must safely navigate through multiple avalanche zones. In addition to several feet of snow, downed trees and rockfall often need to be cleared from the road.”
National Park Service, public domain. That page carries the park’s own stamp: last updated May 13, 2026.
Yosemite National Park
- Mariposa Grove Road and its shuttle. Normally from late April
- Glacier Point Road. Normally from mid May
- Tioga Road, Highway 120 across the park over Tioga Pass. Normally from early June
- Crane Flat, Tamarack Flat, White Wolf, Yosemite Creek, Porcupine Flat and Bridalveil Creek campgrounds. Normally from early July
- Tuolumne Meadows Campground. Normally from early July
- Upper Pines Campground, Yosemite Valley. Year round
Sequoia and Kings Canyon National Parks
- Kings Canyon Scenic Byway to Cedar Grove, Highway 180. Normally from early May
- Mineral King Road. Normally from late May
Lassen Volcanic National Park
- Hiking and cycling the cleared but unopened highway. Normally from mid April
- Lassen Volcanic National Park Highway, Highway 89. Normally from early June

Yosemite National Park publishes the date, year by year
This is the difference between a guess and a measurement. Most parks describe a normal season and leave it there. Yosemite National Park publishes what actually happened, every year, for decades, which answers “when will it open” with a range and how wide it is rather than with a single date.
Tioga Road (Highway 120 through the park): every opening date Yosemite National Park publishes
1957 to 2025, 68 seasonsGlacier Point Road: every opening date Yosemite National Park publishes
1995 to 2025, 30 seasonsThe Lassen Volcanic National Park Highway (Highway 89): every opening date Lassen Volcanic National Park publishes
1980 to 2026, 47 seasonsAcross 68 published seasons the middle opening is 23 May, the earliest was 8 April in 1977 and the latest 22 July in 2023. That is a 105 day spread on the same road. If you are booking around it, the useful number is not the middle date, it is how far the late half runs past it.
Yosemite National Park, Historical Seasonal Opening and Closing Dates“Clearing of the Tioga Road begins on or about April 15 each year and usually takes between one and two months. Predicting when these roads will open is not possible, even in late spring, because weather in April and May can affect plowing progress significantly.”
National Park Service, public domain. That page carries the park’s own stamp: last updated January 16, 2026.
10 California park seasons, and where each one comes from
The last column is the one nobody else shows you: the date the park itself last touched the page each season came from. Read a two-year-old stamp as the park saying nothing has changed, and a stamp from last month as the park saying something has.
| Road or facility | Park | Normal season | What sets the date | Park last updated |
|---|---|---|---|---|
| Hiking and cycling the cleared but unopened highway | Lassen Volcanic | sections open to walkers and cyclists as the plows finish them, weeks before cars are let through | Moves with the snow | May 24, 2026 |
| Mariposa Grove Road and its shuttle | Yosemite | the shuttle runs approximately late April through November, and the road itself is open only to disability placards when it is open at all | Storm closures | September 3, 2026 |
| Kings Canyon Scenic Byway to Cedar Grove, Highway 180 | Sequoia and Kings Canyon | typically open from May through early to mid November | Moves with the snow | July 1, 2026 |
| Glacier Point Road7,214 ft | Yosemite | typically sometime in May until sometime in November, plowing from around 15 April | Moves with the snow | May 13, 2026 |
| Mineral King Road7,500 ft | Sequoia and Kings Canyon | open seasonally from late May through October | Moves with the snow | September 2, 2025 |
| Tioga Road, Highway 120 across the park over Tioga Pass9,943 ft | Yosemite | typically late May or June until sometime in November, with plowing starting around 15 April | Moves with the snow | May 13, 2026 |
| Lassen Volcanic National Park Highway, Highway 898,512 ft | Lassen Volcanic | no established opening date at all; clearing starts as early as mid March and takes about two months, and the road has opened as late as early July | Moves with the snow | May 24, 2026 |
| Crane Flat, Tamarack Flat, White Wolf, Yosemite Creek, Porcupine Flat and Bridalveil Creek campgrounds | Yosemite | July to somewhere between early September and early October depending which one | Moves with the snow | September 5, 2025 |
| Tuolumne Meadows Campground | Yosemite | about July to late September, and only after Tioga Road opens | Moves with the snow | September 5, 2025 |
| Upper Pines Campground, Yosemite Valley | Yosemite | the one Yosemite campground on reservations all year | Fixed by rule | September 5, 2025 |
Each California park publishes its own status
Nothing on this site knows what a road is doing this afternoon, and nothing on this site pretends to. Each block below is the park’s own page, with what it carries and the caveats that go with it.
Make a trip of it
Plan a California park trip from Mariposa
Things to doTours & activities near Yosemite National Park
Guided trips and experiences from local operators.
Browse on Viator
Places to stayStays near Mariposa
Vacation rentals and cabins close to the water.
Browse on VrboWe may earn a commission on bookings made through these links.
California park opening FAQ
The rest of the California season
Park openings in nearby states
Every state with a park season
Every season and quotation on this page comes from a National Park Service page on www.nps.gov, read at build time on 3 September 2026 and shown with the park’s own last updated stamp rather than ours. NPS material is a work of the United States government and is in the public domain. California is one of 7 states where the opening date turns on plowing progress. In Glacier National Park’s words about its own status map: “This report contains the most recent information available for road, hiker/biker, and entrance closures as well as snowplow status. It may be outdated and inaccurate as our information can change quickly.” National picture: park road opening dates in every state